Rani, Hafnidar A, Jurisman Amin, Afizah Ayob, and Dekky Al Rahmatillah. 2022. “Risk Probability of Time and Cost on Building Construction Project: A Monte Carlo Simulation”. Journal of Innovation and Technology 3 (2):60-68. https://doi.org/10.31629/jit.v3i2.5192.