[1]
Rani, H.A., Amin, J. , Ayob, A. and Rahmatillah, D.A. 2022. Risk Probability of Time and Cost on Building Construction Project: A Monte Carlo Simulation. Journal of Innovation and Technology. 3, 2 (Oct. 2022), 60–68. DOI:https://doi.org/10.31629/jit.v3i2.5192.